FAQ CONTACT US SITEMAP       

Installation process click

Click Collection Luxury Vinyl tile


FLOORING INSTALLATION PROCESS   YOUTUBE

STEP 1.

The B plate tenon plate inclined embedded in the fillister locking put it flat.



STEP 2.

After put it flat, B plate and C plate spacing about 2-3 mm, into parallel lines.



STEP 3.

Lift up A and B at the same time
(Note: with the ground at a 45 degree angle).



STEP 4.

B along the C direction, flat push locking.



STEP 5.

With the palm of the hand to be A plate and B plate downward pressure but do not force to press floor.



STEP 6.

The floors are smooth without slit after installation. If the floor are not smooth or have slit, they need to be lifted slightly and locked them by 10-30 degree angle. After locking, floor would be smooth automatically.